Direction des Travaux Maritimes – Brest


Rules/Standards: APSAD

Assignment: Client assistance

Find out more about our assignment
High-expansion foam protection of the storage and maintenance pods for the French Navy’s Rafale aircraft fleet.
  • Basic preliminary design.
  • Writing of the particular technical specifications.
  • Site work follow-up and supervision.

Grand Port Maritime


Rules/Standards: APSAD R5

Assignement: Client assistance

Find out more about our assignment
The implementation of a fire detection system and fire hose reels are recommended.
  • Phase 1: Feasibility study.
  • Phase 2: Client assistance mission.
  • Phase 3: Writing of tender documentation.

DCNS – TOULON


Rules/Standards: DCNS

Assignment: Design and manufacture of subassemblies

Find out more about our assignment
Design and manufacture of cylinder racks for fire protection of the Foudre Landing Platform Dock (LPD) by a semi-fixed CO2 installation.

PARIS ORLY Airport


Rules/Standards: NFPA 409

Assignment: Audit and feasibility study

Find out more about our assignment
Restoration of fire extinguishing systems in the “ZI Nord” hangars to original performance levels.
  • Feasibility study.
  • System audit.
  • Basic preliminary and detailed engineering design.
  • Tender documentation.
  • Construction documents.

SGA


Rules/Standards: APSAD

Assignment: Client assistance

Find out more about our assignment
Client assistance mission during the Construction phase for the fire protection work package at the MRTT maintenance centre at the Istres air base.
  • Supply of the list of documents to be produced, requested by the contractor, to the prime contractor.
  • Assistance with subcontractor selection.
  • Approval of construction documents.
  • Assistance with acceptance operations and test follow-up.
  • Analysis of quotes in the event of alteration work.
  • Verification of as-built records.

DDE – AVORD Air Force Base


Rules/Standards: DCNS (Naval Group)

Assignment: Audit and feasibility study

Find out more about our assignment
Design phase:
  • Audit of the low-expansion foam protection installations for the AWACS hangar.
  • Feasibility study for restoration following various malfunctions.

DCNS – LORIENT


Rules/Standards: DCNS (Naval Group)

Assignment: Technical assistance

Find out more about our assignment
Fire protection of export frigates by FM200 gas modules for the electronics and propulsion rooms.
  • System design.
  • Design calculations.
  • Writing of specifications for outsourced specific equipment.
  • Monitoring of production at the subcontractors’ premises.