NABC – Morocco
Rules/Standards: APSAD and NFPA
Assignment: Client assistance relating to fire protection at NABC sites and design of installations.
Find out more about our assignment
Mission to upgrade the fire control installations at four NABC facilities (fire extinguishers, hose reels, hydrants and detection system).
- System audit.
- Compliance audit.
- Diagnostic audit.
- Recommendations to be implemented.
JOSSELIN PORC ABATTAGE
Rules/Standards: APSAD
Assignment: Project Management
Find out more about our assignment
Modification of the automatic water sprinkler extinguishing system at the Josselin Porc Abattage (JPA) abattoir in Brittany.
Design phase (Project management):
- Preliminary design..
- Fire risk analysis report.
- Water supply design.
- Basic engineering drawings and layouts.
- Writing of the particular technical specifications and the tender documentation.
- Approval of tender documents and drawings.
- Technical assistance for the supervision of works..
Construction phase (Project management):
BRIOCHE PASQUIER - Les Cerqueux
Rules/Standards: APSAD
Assignment: Conceptual definition.
Find out more about our assignment
Conceptual definition of fire protection for the frangipane oven at Brioche Pasquier in Les Cerqueux (western France).
- Preparation of the process flow diagram and layout.
- Budget estimate and writing of the report.
- Conceptual definition.
EVEN NUTRITION ANIMALE
Rules/Standards: APSAD
Assignement: Feasibility study
Find out more about our assignment
- Fire protection of the chillers.
- Feasibility study, pre-dimensioning and process flow diagrams.
- Budgetary approach.
- Writing of the design report.
- On-site presentation meeting.