- THALES BREST (29-France) Project management assistance assignment Project management assistance with sprinklers for NICOT ARCHITECTE as part of the construction of 2 buildings on the NICOT […]
- BOURGES (18-France) Fire project management assignment Fire project management for the installation of a sprinkler protection system throughout the site.
- Orly (94-France) Expert appraisal assignment Fire counter-appraisal with proposals for upgrading and costing of equipment replacement and/or repair. Feasibility study assignment Feasibility study for the addition […]
- BA 125 ISTRES Contracting owner assistance Project management assistance during the construction phase for fire protection of the MRTT maintenance centre at the ISTRES air base.
- TOULON (83-France) Design Study and manufacture of extinguisher frames for fire protection by CO2 installation ½ fixed for Landing Platform Docks (TCD) Lightning. Lorient (56-France) Technical […]
- Avord air base Audit and feasibility Audit of the low-expansion foam protection systems at the “HAWAKS” hangar. Feasibility study for updating following the various malfunctions observed.
- ISTRES – BA 125 (13-France) Fire project management Fire project management for the renovation of 3 aircraft hangars HM3, HM203 and F7X with the TPFI design […]
- Aéroport Charles De Gaulle (95-France) Contracting owner assistance Project management assistance with upgrading fire protection in several aircraft hangars Thirty-year study Thirty-year compliance of a hangar […]










