- Date
 - 30 August 2024
 
BRISSAC (49-France) Feasibility study APSAD Feasibility study for improving fire safety in the various site units- Date
 - 30 August 2024
 
Haye-Fouassière (44-France) Fire project management NFPA Modification of the fire protection system envisaged by MONDELEZ with a view to replacing the racks.- Date
 - 30 August 2024
 
BONDOUFLE (91-France) Feasibility study APSAD Feasibility study for improving fire safety on the site FURDENHEIM (67-France) Fire feasibility study Preliminary design APSAD Feasibility study for the […]- Date
 - 30 August 2024
 
WITTENHEIM (68-France) Feasibility study APSAD Carrying out a feasibility study for upgrading the ESFR installation





