Logistics

AÉROPORT DE PARIS ROISSY (93)


Rules/Standards: APSAD R1.

Assignment: Client assistance.

More information on this project
Client assistance mission for the creation of a sprinkler station in the cargo area.
  • Preparation of civil works and external works guide drawings for fire protection.
  • Writing of the particular technical specifications and the overall cost breakdown.
  • Assistance with the contractor selection process.
  • Assistance with analysing and appraising the bids.
  • Assistance with acceptance operations.
  • Check on hydraulic design calculations.

ITM IMMO – Anais (16)


Rules/Standards: APSAD R12.

Assignment: Project management.

More information on this project
Design phase:
  • Preliminary design.
  • Writing of the particular technical specifications.
  • Tender documentation.
  • Assistance with contractor selection process.
Construction phase:
  • Construction documents.
  • Document approval.
  • Assistance during the works phase.
  • Assistance with acceptance operations.

SEA-TANK – BASSENS (33)


Rules/Standards: EN 13565-2.

Assignment: Conceptual definition.

More information on this project
  • Fire protection of the flammable liquid storage facility.
  • Project management, on-site readings.
  • Pre-definition of fire protection.

BARJANE -Breguieres (13) - ABCD


Rules/Standards: NFPA 13.

Assignment: Project management assistance.

More information on this project
Project management assistance in relation to ESFR sprinkler protection of a 30,000 sq.m logistics building.
  • Writing of the particular technical specifications.
  • Bid alignment.
  • Site work follow-up.

SLOUGH DEVELOPMENT Aulnay-sous-Bois (93)


Rules/Standards: APSAD R1.

Assignment: Appraisal of the sprinkler installations for a logistics platform.

More information on this project
Due Diligence, i.e. the full range of verifications that a potential buyer or investor will perform before a transaction, to get a firm idea of the situation of a company.

SNCF – Saint Dizier (51)


Rules/Standards: APSAD.

Assignment: Feasibility study.

More information on this project
Appraisal of the fire protection of people and property and the determination of water requirements.
  • Proposal of realistic, costed technical solutions (scenarios) to improve fire safety.

EXETER – Saint-Michel/Orge (91)


Rules/Standards: APSAD R1 and EN 12845.

Assignment: Compliance audit.

More information on this project
Compliance audit on the ESFR sprinkler system with the aim of estimating the work to be undertaken to ensure compliance with APSAD or EN standards.
  • System audit.
  • Identification of applicable reference bases.
  • Budget estimate of upgrading work to ensure compliance.

SLOUGH DEVELOPMENT (75)


Rules/Standards: APSAD R1.

Assignment: Appraisal of the sprinkler installations for a logistics platform.

More information on this project
Due Diligence, i.e. the full range of verifications that a potential buyer or investor will perform before a transaction, to get a firm idea of the situation of a company.

SOCAMAINE Champagné (72)


Rules/Standards: APSAD R1.

Assignment: Client assistance.

More information on this project
Client assistance mission concerning the fire protection of a 45,000 sq.m warehouse.
  • Feasibility study.
  • Basic preliminary design.
  • Writing of the particular technical specifications.
  • Tender documentation.
  • Site work follow-up.